Concrete Pouring Tips
Even though concrete is a versatile substance it does have
its limitations that you should consider. Concrete is effected
by temperature, too hot and it dries with cracks, too cold and
it takes forever to set-up- There are chemicals available that
will allow experts to pour concrete in even the worst
conditions, but trailered ready-mix is not intended for these
specialized applications. But if you make proper plans in
advance you should be able to pour concrete anytime. Most small
concrete pours should be planned when the temperatures are
between 60 and 90 degrees Fahrenheit. This means that the
concrete will begin to set-up in a reasonable time but won’t
set-up before you have a chance to finish it.
Hot Weather Tips:
Plan ahead. If you can make arrangements to pour in the cooler time of the day, this will minimize the effects of trying to finish the concrete in the heat. Wet down all the forms and ground just before you pour in the concrete. This will reduce the rate of evaporation of the moisture in the concrete mix. Avoid adding water to the mixture because it will lower the strength, increase cracking and reduce the durability. Limit the time between placing the concrete and final finishing. Use a fog type spray nozzle to maintain surface moisture and to prevent evaporating away the "bleed" water out of the concrete mix before it can be troweled smooth. Provide sunshades to control the surface temperature on the exposed surfaces. Erect windbreaks to reduce the chances of a dry wind that will cause the surface to cure too fast and crack. As soon as the concrete is finished, begin a moist cure by keeping the finished surfaces and pour area damp for the next few days. On extremely hot or windy days, it may be best to reschedule the pour for a day with more favorable conditions.
Cold Weather Tips:
Do not plan to pour concrete when the temperatures will not get above 60 degrees Fahrenheit. If you can, wait until the sun is shining on the pour site. Use a concrete mix with a low water volume so that will have less moisture to reduce cure time. Provide a curing membrane that can be as simple as a plastic tarp or as sophisticated as a concrete curing blanket. It will take longer to cure so you will want to take precautions to keep unwanted travelers from making an impression on your hard work!